2024RoadMaintenance.png

2024 Road Maintenance

2024 Annual Street Maintenance Projects

Routine street maintenance will prolong the life of the Remaining Service Life of the street.

Washington Terrace City has several street maintenance projects planned for this summer. Routine street maintenance is a proactive method to preserve and prolong the Remaining Service Life (RSL) of the streets.

Asphalt preservation treatment could consist of:

  • Chip Seal
  • Crack seal
  • Slurry seal
  • Pothole patching
  • Asphalt overlay
  • Asphalt remove and replace

Each street has been analyzed and prioritized for what type of treatment and when it needs to be treated. Applying the right treatment at the right time will increase the RSL.

The street maintenance applications typically take 1-2 days to apply. Residents in the area will be notified prior to construction and there will be no parking on the street during the construction. Not having to work around parked vehicles and obstacles in the street will ensure a quality project and safety for the construction crew and personal property.